The master bedroom is almost finished. I laid the wood threshhold pieces in front of the exterior doors, and the carpet is installed. The subfloor was replaced (by me!) in places. Both exterior doors have been replaced with matching french doors made of steel, and the builder swears they will not leak anymore. (side note- builder, Aubrey Cate, and I were at Home Depot buying materials, and everyone thought we were a little family taking on a home improvement do-it-yourself project. He was mortified, and quickly set everyone straight that he was a contractor! Quite funny to me!) Baseboards are down, and doors are trimmed out.
The master bathroom tile and vanity are in, and now we are wishing we had replaced the tub and surround before we did that... maybe it can be done later... we'll see. The electrician has replaced the chewed wires, and both bathrooms have lights. Now we need to blow in insulation above the master bedroom/bathroom and have all of the accesses that were cut into the ceiling by the electrician patched.
I admit- I hate carpet- but the pets are loving it, even choosing to sleep on the floor rather than with us, and Aubrey Cate enjoys playing with her toys in there.
See the ceiling fan I hung and the floor I put in?
1 comment:
You need to update this. You've made lots of progress since this last post!!
Post a Comment